floor1
New steel beams set up under improperly located bearing walls. Hydraulic jacks are set up with a laser level to level the floor systems.
floor2
All new steel beam lines set level with footing holes dug.
floor3
Footings are poured and new steel columns are in place. When footings have hardened, shoring is removed.