13
Carbon fiber straps on concrete foundation wall.
14
Foundation wall 1-3/4" out of plumb in 4'. Approximately 3-1/2" overall.
15
Cracks which had been epoxy injected at the same time the carbon fiber was installed have re-cracked through the epoxy as the wall continues to move.
16
Wall is braced, excavated and pushed back. Then properly braced with steel beams.