_DSC0211
Bowed block wall prior to constructing new concrete wall.
_DSC0214
Reinforcing steel set in front of concrete block wall in preparation for new shotcrete wall. Foundation wall was "braced" with carbon fiber straps that failed.
CB1
Diagonal and horizontal cracks in concrete block foundation wall.
CB2
Relatively long block foundation wall bowed inward with horizontal crack.
CB3
Close up of relatively large horizontal crack in block wall tuck pointed.
CB4
Block foundation wall bowed inward with horizontal and diagonal cracks.
CB5
First row of concrete blocks above floor sliding past lowest block course which is restrained by the concrete floor slab. This is a shear failure of the mortar joint.
CB6
Bowed block foundation wall with large horizontal crack.
CB7
Block foundation wall partially removed showing shifting and bowing caused by lateral soil pressure.
DSCN1111
Severely bowed and cracked concrete block foundation wall with shear failure along bottom.
DSCN1126
Severely bowed and cracked foundation wall with shear failure along bottom.
HCB06
Close up view of shear failure along mortar joint. First block course up from floor.
HCB09
Severely bowed concrete block foundation wall with shear failure along bottom.
HCB10
Concrete block joints cracking at perimeter of tie back anchor.
HCB11
Carbon fiber strap on bowed block foundation wall. Wall continues to move inward.
HCB12
Connection failure of carbon fiber strap to base of concrete block foundation wall. Wall continues to shear inward along bottom.