pic4
View of reinforcing work from the floor level. Note the extensive interferences which had to be worked around.
pic5l
Shear plates are installed in truss chords to increase bolt capacities.
pic6l
Chord members are reinforced with additional timber, panel point connections are reinforced with steel plates.
pic6l2
Working around mechanical equipment and ceiling framing can be difficult and time consuming.
pic7l
When truss member forces exceed the capacity of timber framing, steel is used for reinforcement.
pic8l
New steel column installed with new footing to reduce truss reinforcement requirements.
pic9